MANUFACTURING
- Ethenizers/De-ethenizers
- Columns
- Heat Exchangers
- Pig Launtchers
- Water Heater
- Skid Mounted Packages
- Piping
- Boilers
- Reactors
- Industrial Steel Structures
- Slug Catchers
- Gas Scrubbers
- API Tanks
- Pressure Vessels
- Two and Three phase separator
Execution of work in fauz manufacturing is based on international standards including ASME, BS, DIN, API, TEMA, AWS, JIS, NACE, ASTM, etc. A safe working environment and complying with specified safety procedures are of primary importance taking into consideration that safety is for minimizing risk and for uninterrupted progress. Zero-time lose injury reports and near-miss reports along with emergency response plan are part part of FAUZ focus. An effective documented quantity control system ensures that the products are manufactured are the manufactured according to the specification and code. Firm monitoring and control of procedures during manufacturing process starting from design, effective raw material procurement, welding procedures, qualification of welders to the final inspection/testing stage has been adopted according to the appropriate design codes and standards. FAUZ facility is fully equipped with cutting edge technological equipment and competent human capital with hands on experience in the job ranging from simple ducting up to complex manufacturing like separator , distillation columns, kiln shells and entox mills. For planning and scheduling prima-vera p-3 is a tool in use for the project planning and control.